Ridgeline — Sample Case Studies

Case Studies

Three Jobs,
Start to Finish

The scope, the surprises, the schedule, and what the client said after.

The Alder Street kitchen, finished
Case Study 01 · Kitchen

The 1962 Galley That Fought Back

Before: a seven-foot galley with one outlet and a wall hiding the dining room. The surprise: demo revealed knob-and-tube wiring — flagged day one, priced in writing by day three, client approved by phone.

After: wall out, island in, panel upgraded. Delivered in seven weeks — one week over the original six, exactly matching the revised schedule the client approved.

7 wksBuild Time
1Change Order
0Surprise Charges
Case Study 02 · ADU

A Backyard That Pays Rent

Before: a weed lot behind the garage and a hunch it could be worth something. Feasibility check said yes: setbacks cleared, utilities close, city pre-approved plan eligible.

After: 498 sq ft studio ADU — kitchenette, full bath, mini-split, separate meter. Permitted in nine weeks, built in fourteen, listed for rent in week fifteen. First tenant signed before the paint had a second coat.

14 wksBuild Time
498Square Feet
Wk 15Tenant Signed
The finished backyard ADU
The finished primary bathroom
Case Study 03 · Bath

The Bathroom on a Deadline

Before: one working bathroom, in-laws arriving in six weeks, and a tub last updated during the Reagan administration. The bid was scoped to the deadline: no layout changes, everything in stock, zero special orders.

After: curbless shower, double vanity, heated floor. Finished in five weeks — six days before the guest room filled. The client’s review is on the testimonials page; the in-laws never knew how close it was.

5 wksBuild Time
6 daysAhead of Deadline
5★Client Review

Your Job Could Be Case Study 04

Every project above started with the same free walk-through.